| Year of construction | 10/2022 |
| Project No. | 2022-10285 |
| Country | North Rhine-Westphalia, Germany |
| Organic pollution | 23,000 MWh per Year |
| Technology | Gas Upgrading |
| Scope of delivery | Planning, approval planning, manufacture/delivery, commissioning |
| Modules | Gas Upgrading in a 20 ft Container Activated Carbon Filter: AF-H2S.400 Gas Dehydration / Refrigeration Dryer: GKT-WT.600 Gas Compressor Station: SKV-900 Safety Equipment Control System |
One of Europe’s largest food producers relies on efficient anaerobic wastewater treatment and state-of-the-art biogas utilization in its sugar production. To further increase energy efficiency and ensure optimal biogas use, a high-performance gas upgrading system from FlexBio was installed at the site.
The system is designed for a biogas throughput of up to 500 m³/h and includes a gravel bed pre-filter, a gas refrigeration dryer with heat recovery, an activated carbon filter, a gas compressor station, and comprehensive measuring, control, and automation technology. This ensures that the biogas is reliably purified and made available for safe, flexible, and efficient utilization.